Addition of new HVAC systems to a previously unconditioned space including new rooftop package mechanical units, new insulation, and new power system distribution to the building. Project team includes DPR Construction, CPCA Architects, Bergelectric and ACCO Engineered System.
Conversion of an existing 4,000 square foot office space to a specialized preschool and day care facility including classrooms, student commons, private offices, and support spaces. Project team includes DTV Designs and Godman Development & Construction.
The replacement of the buildings three variable air volume (VAV) air handling units, the conversion of thirty-five pneumatic controlled VAV terminal units to direct digital control and the replacement and upgrade of a 150kVa transformer. Project team includes ABM and Laser Electric.
New music building server room including primary and redundant critical room air condition (CRAC) units. Project team includes Barrie + Co and Helix Mechanical.
16,000 square foot tenant improvement one two floors of an existing building including classrooms, offices and support spaces. Project team includes Lockrul Construction and Bergelectric.
10,000 square foot tenant improvement in existing building including classrooms, offices and support spaces. Project team includes RBN Design.
30kW solar photovoltaic power system on an existing building in San Diego, CA. Including both 300W standard with solar edge optimizers and two inverters. Project team includes Sass Electric.
30kW solar photovoltaic power system on an existing building in San Diego, CA. Including both 310W standard with solar edge optimizers and two inverters. Project team includes Sass Electric.