California State University San Marcos

PROJECTS

Science Classroom

Conversion of two existing classroom spaces into lab and lab support areas including new DOAS units and VAV phoenix valves. 

Extended Learning Temecula Renovation

20,000 square foot renovation to an extended learning building including nursing, childhood development, business, criminology, and software engineering. 

Kellog Library 4th Floor Office Build-Out

12,000 square foot renovation including new private offices and open office space. 

Student Union Tenant Improvement

Phased construction of an approximately 10,000 square foot selective interior tenant improvement on the third floor of an existing building.

CS-1 Chilled Water (CHW) Due Diligence

Mechanical due diligence study to rework the inline CHW pumps serving an existing building.

Office Building CHW Due Diligence

Mechanical due diligence study of an approximately 19,000 square foot office building.

ACD Lecture Hall 102 FC

Replacement of an existing ceiling mounted fan coil serving the lecture hall with a new floor mounted unit.

ACD Lecture Hall Fan Coil Replacement

HVAC and controls renovation of a 6,000 square foot lecture hall. 

Kellog Library 3rd Floor Office Build-Out

5,000 square foot renovation including two new private offices and conference room. 

Arc Flash Study

Fault current evaluation, protective device coordination, and arc flash risk assessment for a single building at CSUSM. 

Accessible Path

New lighting for a new accessible path on campus.

Clarke Field House Boiler

Replacement domestic hot water boiler serving an existing building.

Extended Learning Restroom Door Actuators

Power for new motorized door actuators in an existing restroom.

CS-2 Generator Day Tank Due Diligence

Mechanical due diligence study to add a secondary day tank to an existing generator serving an existing building.

University Hall GN Restroom

Conversion of an existing maintenance mechanical workshop into a gender-neutral restroom.