Conversion of two existing classroom spaces into lab and lab support areas including new DOAS units and VAV phoenix valves.
20,000 square foot renovation to an extended learning building including nursing, childhood development, business, criminology, and software engineering.
12,000 square foot renovation including new private offices and open office space.
Phased construction of an approximately 10,000 square foot selective interior tenant improvement on the third floor of an existing building.
Mechanical due diligence study to rework the inline CHW pumps serving an existing building.
Mechanical due diligence study of an approximately 19,000 square foot office building.
Replacement of an existing ceiling mounted fan coil serving the lecture hall with a new floor mounted unit.
HVAC and controls renovation of a 6,000 square foot lecture hall.
5,000 square foot renovation including two new private offices and conference room.
Fault current evaluation, protective device coordination, and arc flash risk assessment for a single building at CSUSM.
New lighting for a new accessible path on campus.
Replacement domestic hot water boiler serving an existing building.
Power for new motorized door actuators in an existing restroom.
Mechanical due diligence study to add a secondary day tank to an existing generator serving an existing building.
Conversion of an existing maintenance mechanical workshop into a gender-neutral restroom.