Science & Technology

CHEMISTRY LABS | WET LABS | CLEAN ROOMS | ELECTRONIC LABS | DATA CENTERS | VIVARIUMS

Becton Dickinson

BioMed Realty Headquarters

Cell Applications

Centerpark Campus

Centerpark Mesa Ridge Spec Suite

Crown Biosciences

Genalyte Tenant Improvement

Genesis San Diego

Genesis Science Center

Hologic GDC-2 Biotheranostics

IDEX Pharmaceuticals

Inseego

Kinnate Biopharma

NAMSA

Neomorph

Renesas

Source Bioscience

SOVA Science District Campus Reimage

SOVA Science District Campus Spec Labs

SOVA Spec Suite

Sycamore Creek

The Reserve

Tyra Biosciences

Undisclosed Client Data Center

Undisclosed R&D Facility

additional PROJECTS

Cuyamaca College, Building H Laboratory Building

New chemistry laboratory building including chemical fume hoods, DI water piping, ACID waste, natural gas piping, power, and telecommunications distribution. Project team included Di Donato Associates.

Grossmont College, IS Server Room

Main central campus server room HVAC system design including redundant computer room HVAC units, redundant air systems, and emergency power distribution. Project team included Di Donato Associates.

General Atomics G76, Laser Lab

New laser lab build-out including compressed air piping, processed chilled water system, and new power distribution. Project team included Warren Scott Architecture.

Cubic, Building 2

65,000 square foot electronics laboratory including fume hoods, DI water system, compressed air system, vacuum system, process piping, 4160V service, substation, and new power distribution. Project team included Roy Davies Architecture, Prevost Construction, Summit Electric, Greater San Diego Air Conditioning, and South Bay Plumbing.

Nuvasive Amenities Building

14,000 square foot café and fitness center build-out at an existing campus headquarters. Project included complete kitchen, food prep, service, and dining spaces. Project team included Hollander Design Group and Good & Roberts.

UCSD Skaggs School of Pharmacy and Pharmaceutical Sciences

Renovation of an existing science building laboratory including process piping, hazardous material storage, and fume hoods. Project team included Associated Mechanical Contractors.

UCSD Applied Physics & Mathematics, Algae Lab

Conversion of an existing wet laboratory into an algae research lab including the addition of fume hoods, clean and dirty support spaces, and -20F freezers. Project team included Helix Mechanical.

UCSD Leichtag, Prion Lab

Conversion of an existing chemistry laboratory into a Prion research lab including the addition of fume hoods, bio safety cabinets, dirty support spaces, and high temperature process equipment. Project team included Helix Mechanical.

Source Bioscience

8,000 square foot tenant improvement including new standby diesel generator, new power distribution, and lab build-out in an existing building.

Torrey Pines Science Center Site and Amenity Space

Reimage of the entire four building campus exterior including new landscaping, hardscaping, walkways, pathways, seating areas, gym, locker room, and café. Project team included Healthpeak Properties and L7 Studio Architects.

Hologic Medical Device Company

Lab air system rebalance in multiple labs. Project included new supply and exhaust constant volume air valves, heating hot water reheat coils, and new BMS controls. Project team included MW Mechanical.

Hologic Medical Device Company TPZ and RFZ

7,500 square foot laboratory tenant improvements including the addition of new Lyophilizer in multiple labs. Project included new constant volume terminal air valves, heating hot water reheat coils, and new BMS controls. Project team included Smith Consulting Architecture.

M2 Ingredients

Conversion of an existing 10,000 square foot warehouse into laboratory including clean room design with fan powered HEPA filtration, DI water, steam boiler system, and processed piping. Project team included Ware Malcomb, Greater San Diego Air Conditioning Company, and KMP Plumbing.

Sanford Burnham Prebys Medical Discovery

5,000 square foot laboratory tenant improvements including the addition of process nitrogen system in the first floor Bldg. #6 labs. Project included new fume hoods, phoenix air valves, DI water, and new BMS controls. Project team included Helix Mechanical.

The Scripps Research Institute Tissue, Culture Labs

Lab air system rebalance and addition of Tissue Culture rooms in multiple labs. Project included new fume hoods, supply and exhaust phoenix air valves, heating hot water reheat coils, and new BMS controls. Project team included Alpha Mechanical.

  • IMM Lab 115 & 116
  • IMM Lab 304
  • IMM Lab 305 & 306
  • IMM Lab 319
  • Calibr Lower Level Lab