Solar Photovoltaic | Battery Storage | Microgrids | Electric Vehicle Charging | Energy Audits
30kW solar photovoltaic power system on an existing building in San Diego, CA including both 300W standard with solar edge optimizers and two inverters. Project team included Sass Electric.
30kW solar photovoltaic power system on an existing building in San Diego, CA including both 310W standard with solar edge optimizers and two inverters. Project team included Sass Electric.
Two new level 2 charging stations and new power distribution. Project team included HMT Electric.
One 110kW 480V DC Charge Box with two DC charging kiosks and two 19.2kW chargers including new power distribution. Project team included the Gravity Company and ABM.
New power distribution including transformer and panelboard for DC rapid electric vehicle car charging stations. Project team included Pepes Electric.
250kW standby generator addition to back up entire facility.
New power distribution including 600-amp 208V 3 phase distribution panelboard and metering for six new level-2 13kVA electric vehicle charging stations at an existing building. Project team included HMT Electric.
Energy audit of an existing 176,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team included The Casey Brown Company.
Energy audit of an existing 92,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team included The Casey Brown Company.
Energy audit of an existing 61,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team included The Casey Brown Company.
New 150kW generator to replace two existing generators.