Energy

Solar Photovoltaic | Battery Storage | Microgrids | Electric Vehicle Charging | Energy Audits

Makers Quarter

SDG&E Beach Cities Solar Racking

SDG&E Beach Cities Solar Warehouse

SDG&E Eastern EV Chargers

SDG&E Eastern Solar Photovoltaic

SDG&E Kearny Mesa EV Chargers

SDG&E Mountain Empire Microgrid

SDG&E OCCO EV Chargers

SDG&E Ramona Microgrid

UCSD Osler Parking Structure Solar Photovoltaic

additional PROJECTS

Student Success Charter School Solar Photovoltaic Power System

30kW solar photovoltaic power system on an existing building in San Diego, CA including both 300W standard with solar edge optimizers and two inverters. Project team included Sass Electric.

Audeo Charter School Solar Photovoltaic Power System

30kW solar photovoltaic power system on an existing building in San Diego, CA including both 310W standard with solar edge optimizers and two inverters. Project team included Sass Electric.

Volvo Corporate Electric Vehicle Charging

Two new level 2 charging stations and new power distribution. Project team included HMT Electric.

Porsche Miramar Electric Vehicle Charging Stations

One 110kW 480V DC Charge Box with two DC charging kiosks and two 19.2kW chargers including new power distribution. Project team included the Gravity Company and ABM.

Jaguar Electric Vehicle Charging Stations

New power distribution including transformer and panelboard for DC rapid electric vehicle car charging stations. Project team included Pepes Electric.

Willdan Energy Audits

APCD

250kW standby generator addition to back up entire facility.

NOAA Generator

Sun garden Terrace Generator

Grande North Electric Vehicle Charging Stations

New power distribution including 600-amp 208V 3 phase distribution panelboard and metering for six new level-2 13kVA electric vehicle charging stations at an existing building. Project team included HMT Electric.

Valley Corporate Center Energy Audit

Energy audit of an existing 176,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team included The Casey Brown Company.

Chesapeake Energy Audit

Energy audit of an existing 92,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team included The Casey Brown Company.

Old Town Plaza Energy Audit

Energy audit of an existing 61,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team included The Casey Brown Company.

Roselle Street Generator

New 150kW generator to replace two existing generators.

Irvine Company Lighting Retrofit