Student Success Charter School Solar Photovoltaic Power System

30kW solar photovoltaic power system on an existing building in San Diego, CA. Including both 300W standard with solar edge optimizers and two inverters. Project team includes Sass Electric.

Audeo Charter School Solar Photovoltaic Power System

30kW solar photovoltaic power system on an existing building in San Diego, CA. Including both 310W standard with solar edge optimizers and two inverters. Project team includes Sass Electric.

Volvo Corporate Electric Vehicle Charging

Two new level 2 charging stations and new power distribution. Project team includes HMT Electric.

Porsche Miramar Electric Vehicle Charging Stations

One 110kW 480V DC Charge Box with two DC charging kiosks and two 19.2kW chargers including new power distribution. Project team includes the Gravity Company and ABM.

Jaguar Electric Vehicle Charging Stations

New power distribution including transformer and panelboard for DC rapid electric vehicle car charging stations. Project team includes Pepes Electric.

Willdan Energy Audits

APCD

250kW standby generator addition to back up entire facility.

NOAA Generator

Sun garden Terrace Generator

SDG&E OCCO EV Charging

Grande North Electric Vehicle Charging Stations

New power distribution including 600-amp 208V 3 phase distribution panelboard and metering for six new level-2 13kVA electric vehicle charging stations at an existing building. Project team HMT Electric.

Valley Corporate Center Energy Audit

Energy audit of an existing 176,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team includes The Casey Brown Company.

Chesapeake Energy Audit

Energy audit of an existing 92,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team includes The Casey Brown Company.

Old Town Plaza Energy Audit

Energy audit of an existing 61,000 square foot building including review of existing mechanical infrastructure, mechanical controls, lighting, lighting controls, plumbing fixtures, and recommendations for upgrades to reduce energy and operating costs. Estimated energy and operating savings compared to upgrade cost were calculated to provide a simple payback analysis. Project team includes The Casey Brown Company.

Roselle Street Generator

New 150kW generator to replace two existing generators.

Irvine Company Lighting Retrofit