Veterans Affairs

PROJECTS

Jennifer Moreno Department of Veterans Affairs Medical Center

20,000 square foot exhaust system retrofit in three buildings located in San Diego, CA. Project team included BCP Mechanical

VA Hydronic Preheat Due Diligence

Scope included a preheat hot water (PHW) study in an existing building located in San Diego, CA. The purpose of the study was to provide an opinion of any infrastructure deficiencies as well as recommendations for improvements.

VA Steam PRV Due Diligence

Scope included a steam pressure reducing valve (PRV) study in an existing building located in San Diego, CA. The purpose of the study was to provide an opinion of any infrastructure deficiencies as well as recommendations for improvements.

VA Oceanside Clinic HVAC Load Calculations

HVAC load calculations for the server room.

VA Administration Building

Approximately 2,000 square foot administration office tenant improvement in an existing building in San Diego, CA.

Veterans Benefits Administration

Interior, 2-story, 16,500 square foot tenant improvement including training rooms, pantry, exercise area, meeting rooms, private office, restrooms, and support spaces. Project team included Safdie Rabines Architects and Backs Construction.

VA Long Beach Third Party Review

Mechanical due diligence study of a ground-up VA community living center building located in Long Beach, CA. The study included a written narrative of the mechanical systems, a list of any mechanical infrastructure deficiencies, and mechanical feasibility recommendations to assist the contractor.

VA Hospital Air Balance Documentation

Air balance documentation of three existing VA buildings located in San Diego, CA.

VA Hospital Oceanside Server Room

HVAC system design for the main server room including primary and redundant critical room air condition (CRAC) units.

VA San Diego Regional Office

Approximately 8,000 square foot office tenant improvement in an existing 4-story building.