20,000 square foot exhaust system retrofit in three buildings located in San Diego, CA. Project team included BCP Mechanical
Scope included a preheat hot water (PHW) study in an existing building located in San Diego, CA. The purpose of the study was to provide an opinion of any infrastructure deficiencies as well as recommendations for improvements.
Scope included a steam pressure reducing valve (PRV) study in an existing building located in San Diego, CA. The purpose of the study was to provide an opinion of any infrastructure deficiencies as well as recommendations for improvements.
Mechanical due diligence study of a ground-up VA community living center building located in Long Beach, CA. The study included a written narrative of the mechanical systems, a list of any mechanical infrastructure deficiencies, and mechanical feasibility recommendations to assist the contractor.
Air balance documentation of three existing VA buildings located in San Diego, CA.
HVAC system design for the main server room including primary and redundant critical room air condition (CRAC) units.