University of California San Diego

PROJECTS

UCSD Sunshine Market

New ground-up retail market on an existing empty space on campus including interconnect for power and telecommunications at the CMRR building. Project is a showcase and experiment for future unattended markets where customers are automatically charged for items taken from the market. Project team included Jacob Blatt Architecture and Accel Robotics.

UCSD MET Telemed Offices Improvements

Renovation in an existing building including new offices, open office space, and work rooms. Project team included UCSD Facilities Management Design Team.

UCSD Bio Field Station Facilities Shop Renovation

New wood and electronic shop build-out including saws, dust collectors, work benches, air compressors, and HVAC systems in an existing building on campus. Project team included Helix Mechanical.

UCSD Geisel Library Renovation Lighting Design

Lighting design services for renovations to the main entries, corridors, classrooms, service hub, gallery, and meeting spaces. Project team included Kevin deFreitas Architects.

UCSD North Campus Housing Office Renovation

Multiple tenant improvements in multiple residential buildings including new meeting rooms, offices, break room, and storage rooms. Project team included SVA Architects.

UCSD Health Via Tazon Medical Office

56,000 square foot medical office tenant improvement on two floors of an existing building including exam rooms, nurses’ stations, doctors’ offices, imaging rooms, and support spaces. Project team included RBN Design and Bergelectric.

UCSD Scripps Institute of Oceanography MARFAC Renovation

Renovation of an existing restroom to be disabled access compliant including men’s room, women’s room, break room, and janitors’ closet. Project team included Architects Mosher Drew.

UCSD Medical Clinic at UTC Mall

12,000 square foot medical office tenant improvement in an existing shell space including exam rooms, nurses’ stations, doctors’ offices, imaging rooms, and support spaces. Project team included RBN Design.

UCSD Mayer Hall Student Success Center

Conversion of three existing laboratory spaces into an approximately 2,000 square foot student services center including meeting rooms and study spaces. Scope included full MEP design service as well as architectural lighting design. Construction cost of $3.5M. Project team included Kevin DeFreitas Architecture, Align Builders, and Anderson Howard Electric.

UCSD SOARS Arc Flash Hazard Analysis

Arc flash hazard analysis for the installation of a new switchboard and power distribution at an existing building. Project team included Anderson Howard Electric.

UCSD UPC Element Concierge Medicine

2,500 square foot medical office renovation in an existing building. Project team included Safdie Rabines Architects.

UCSD Bonner Hall Lab Improvements

Renovations in several rooms including 3417 lab, 3422 & 3430 work room, 3414 insectary, 4137 office, and 4333 lab. Project team included Gilchrist Architecture Co.

UCSD Bio Field Station Insectary

Renovations in an existing building to create an insectary including microscope lab, controlled air lock, cold storage, rearing room, and plant growth room. Project team included Gilchrist Architecture Co.

UCSD Greenwich Drive Upgrades

New fire sprinkler and seismic upgrades for two existing buildings, approximately 100,000 square feet including ADA restroom upgrades, new mothers’ rooms, gender neutral restrooms, and LED lighting retrofit. Project team included Kevin DeFreitas Architecture, Dempsey Construction, Rowan Electric, and Paradigm Mechanical.

UCSD Osler Solar Photovoltaic Power System

250kW solar photovoltaic power system on an existing parking structure in San La Jolla, CA including 10 solar canopies with 25kW inverters per canopy connected to a central photovoltaic panelboard. Project team included HMT Electric and Swinerton Builders.

UCSD Skaggs School of Pharmacy and Pharmaceutical Sciences Renovation

Renovation of an existing science building laboratory including process piping, hazardous material storage, and fume hoods. Project team included Associated Mechanical Contractors.

UCSD Leichtag Prion Lab

Conversion of an existing chemistry laboratory into a Prion research lab including the addition of fume hoods, bio safety cabinets, dirty support spaces, and high temperature process equipment. Project team included Helix Mechanical.

UCSD Applied Physics & Mathematics Algae Lab

Conversion of an existing wet laboratory into an algae research lab including the addition of fume hoods, clean and dirty support spaces, and -20F freezers. Project team included Helix Mechanical.

UCSD Torrey Pines Court Office Suites

Renovation of five off campus office spaces locate in La Jolla, CA including new lighting, lighting controls, power distribution, HVAC, and plumbing systems. Project team included CBRE and Hurkes Harris Design.

UCSD UPC Building Up Air Handler Replacement and Elevator Upgrades

Replacement of the existing air handling unit supply fans, return fans, duct work, and elevator in an existing building located in La Jolla, CA. Project team included First Mark Contracting.

UCSD Thanos Kristallis Dental Clinic

1,500 square foot dental clinic interior tenant improvement including OSHPD 3 exam rooms, equipment rooms, waiting area, and support spaces located in La Jolla, CA. Project team included RBN Design Commercial Interiors and First Mark Contracting.

UCSD UPC Element Elevator & Coffee Cart Improvements

Replacement of an existing elevator and power for new coffee cart at an existing building.