Boiler retrofit project including (2) new 1,999 MBH hot water boilers, (3) 1,500 MBH domestic water boilers, (2) 2,250-gallon storage tanks, and a variable flow pumping system. The new boiler system provides energy efficient heating and domestic hot water to the entire hotel. Project team included ABM Mechanical.