Cubic

PROJECTS

Cubic Building 2

65,000 square foot electronics laboratory including fume hoods, DI water system, compressed air system, vacuum system, process piping, 4160V service, substation, and new power distribution. Project team includes Roy Davies Architecture, Prevost Construction, Summit Electric, Greater San Diego Air Conditioning, South Bay Plumbing.

Orbital Area 7 AKT

3,000 square foot interior expansion including secure dry labs, offices and conference rooms. Project team includes Adamo Construction and Thermodynamic Heating & A/C

VA Hospital Oceanside Server Room

HVAC system design for the main server room including primary and redundant critical room air condition (CRAC) units.Project team includes Emcor.

Viasat N4

5,000 square foot interior tenant improvement including thermal vibe room and electronics laboratories. Project team includes Pacific Rim Mechanical

Long Range Acoustical Devices

53,000 square foot tenant improvement including offices, warehouse, engineering and production spaces for a defense contractor located in San Diego. Project team includes CBRE, Ware Malcomb, Burger Construction, Prime Electrical and Greater San Diego Air Conditioning