HVAC system design for the main server room including primary and redundant critical room air condition (CRAC) units, new 208V/120V transformer, and power distribution. Project team included Astro Mechanical.
Plumbing infrastructure system retrofit to an existing pier including waste, domestic cold and hot water, industrial cold and hot water, compressed air, and BMS control systems. Project team included Construction Testing & Engineering, Inc.
Replacement of the existing rooftop HVAC systems serving an existing building including DOAS units, exhaust fans, chilled and heating hot water piping, rooftop ductwork, and BMS control systems. Project team included Astro Mechanical.