Energy analysis of the existing interior lighting, exterior lighting, building envelope, HVAC, and plumbing systems to determine energy savings upgrades.
Lighting, HVAC, building envelope, and plumbing retrofits for energy savings.
80kW solar photovoltaic power system on parking lot canopies.
Mircogrid power system including service entrance interconnect, battery energy storage system sized for 24 hours of run time, solar photovoltaic interconnection, standby diesel generator, and sequence of operations.
Project team included Cadiz & Cadiz Architects, JLL, MCM Utility Services, Nielsen, and GoElectric.