Grossmont-Cuyamaca College

PROJECTS

Cuyamaca College Chiller Plant Assessment

Mechanical due diligence study of an approximately 4,000 square foot central plant.

Cuyamaca College Building H Laboratory Building

New 4,000 square foot chemistry laboratory building including chemical fume hoods, deionized water piping, ACID waste, natural gas piping, power distribution, and telecommunications distribution. 

Cuyamaca College Building D Central Plant

Central plant equipment replacement including cooling tower, heating hot water boiler, domestic hot water system, condenser water pumps, chilled water pumps, heating hot water pumps, and exhaust fans. 

Cuyamaca College Learning Resources Center Renovation

Renovation to the tutorial center public center and quiet study room including new lighting, power, and HVAC ductwork. 

Cuyamaca College Building H MDF Relocation

HVAC system design for the main central campus server room, including primary and redundant critical room air condition (CRAC) units, low pressure air distribution, and emergency power distribution.

Cuyamaca College Deferred Maintenance Tasks

Campus-wide deferred maintenance design tasks.

Grossmont College Chemical Storage CDs

Code compliance retrofit to the chemical storage building.

Grossmont College Scoreboard Replacement

New scoreboards at the existing baseball and softball fields including power and signal connections. 

Grossmont College Special Needs Restrooms

New special needs restrooms including new power, telecommunications, and fire alar distribution from the existing campus buildings nearby. 

Grossmont College IS Server Room

HVAC system design for the main central campus server room including primary and redundant critical room air condition (CRAC) units and emergency power distribution. 

Grossmont College Building 86 AC Replacement

Replacement of nine rooftop package units at an existing 10,000 square foot building. .