City of San Diego

City of San Diego

PROJECTS

City of San Diego As-Needed Electrical Engineering Services for the Engineering & Capital Projects Department

Administering professional services, including the preparation of reports, studies and/or construction documents relating to electrical systems and/or control systems for sports lighting, security lighting, pump station rehabilitations, HVAC and mechanical systems, street lighting, traffic signals, water and/or sewer plant upgrades, and various building upgrade projects.

Fire Station No 51

Ground-up, 2-story fire station totaling 10,700 square feet of interior space, including apparatus bay, fitness room, medical area, bunks, kitchen/dining, day room, patio, parking lot, and support spaces.

North City Water Reclamation Plant Chiller and Cooling Tower Replacement

Central plant improvements which included chiller replacements, condenser pump replacements, cooling tower replacements, electrical upgrades, and controls.

Chollas PV

257.58kW roof mounted PV on an existing building located in San Diego, CA.

La Jolla Streetscape Lighting

New public street lighting from Prospect Street to Silverado Street.

ETDC Solar Photovoltaic

207.36 kWDC (195.8 kWAC) solar photovoltaic power system design on seven new solar canopies in a parking lot located in San Diego, CA.

MBC Area 51 AHU Replacement

Replacement of three air handling units (AHU) serving an existing building.

Marie Widman Comfort Station Demolition

Demolition of an existing comfort station, including relocation of the SDGE service to a new meter pedestal and reconnection of the existing park lighting.

Fire Station No 48 VDC Administration

VDC administration for an approximately 12,345 square foot fire station.

Pump Station 64 Starter Upgrade Phase II

Removed and demolished the existing medium-voltage motor starters from the MCC-HV2 section of the main switchgear for multiple pumps. Replaced them with new electrical starters, matching the configuration of the previous eight electrical starters installed. Spliced and extend existing conductor wiring as necessary to reach the new termination points. 

Miramar Pl Fleet Main Facility Upgrade

Installation of new vehicle lifts in an existing facility.

Miramar Pl Fleet Main Locker Room Renovation

Approximately 3,400 square foot locker room and office renovation in an existing facility.

ETDC Solar PV

207.36kW canopy PV in an existing parking lot located in San Diego, CA.

Torrey Pines Clubhouse

Facilities master plan and 30% design-build bridging documents for Torrey Pines Golf Course, including a new practice green, new clubhouse and cart barn, renovation of the existing parking lot with new EV chargers and lighting, a new ancillary maintenance facility, course comfort stations, and more.

San Diego Convention Center Roof Replacement

Mechanical, electrical, and plumbing solicitation documents related to the replacement of the existing northwest roof of a building located in San Diego, CA.